What equipment will we need to add to the distribution system?
On typical applications, the only equipment that needs added is the UtiliData® Line Voltage Monitor, to return end-of-line voltages to the substation. The AdaptiVolt™ system interfaces with existing regulators and load tap changers on the distribution line.


